Bathroom Renovation.

For over 50 years, LF Builders has proudly served the Toronto area, delivering top-tier craftsmanship in bathroom renovations. With more than 30,000 completed projects, we specialize in transforming bathrooms into luxurious and functional spaces. From modern designs to classic styles, our team ensures quality and precision in every project. Whether you're looking to upgrade your bathroom for comfort, style, or increased property value, our Toronto-based experts bring your vision to life with exceptional attention to detail and craftsmanship.

CERTIFIED ONTARIO LTD.

FULLY LICENSED & INSURED
Tighty Whitey Samm Simon, the LF Builders mascot

“Water only needs one loose corner of caulk to reach your subfloor. The $12 tube is the best renovation deal in the house.”

— Tighty Whitey Samm Simon · renovation.reviews

The homeowner’s guide

Where bathroom money actually goes

Labour and waterproofing, not the pretty stuff. A full gut runs roughly a third demolition-plumbing-electrical, a third tile and waterproofing, a third fixtures and finishes. The invisible layer decides whether the room lasts: a proper shower is membraned (Schluter or equivalent) behind the tile, sloped to drain, and vented so moisture leaves the room. Tile over bare drywall in a wet zone is how you buy the same bathroom twice.

Keep the layout, keep thousands

Moving a toilet means moving a 3-inch drain stack; moving a shower means rerouting supply and drain through joists. Every metre of relocation is real money and permit territory. If the current layout works, a full refresh in the same footprint (new tub or shower, tile, vanity, floor) delivers 90% of the wow for a lot less. Save layout changes for when the room genuinely doesn't function.

The moisture math of a Toronto bathroom

A family of four puts litres of water vapour into that little room daily. Without a properly sized fan vented outside (not into the attic, we keep finding this), that vapour condenses in walls and windows, and you get peeling paint, black grout lines, and eventually mould remediation. The fan should run during and 20 minutes after showers; a humidity-sensing switch is a cheap upgrade that removes the human error.

Two to three weeks, if it's planned right

A properly run bathroom goes: demo (days 1–2), rough plumbing and electrical plus inspection (3–5), board and waterproofing (6–8), tile (9–12), fixtures, glass, and paint (13–18). The killer of every timeline is materials arriving late, so a good contractor won't start demo until your tile, tub, and vanity are physically in the garage. If someone offers to start tomorrow with nothing ordered, that's a red flag with a paintbrush.

Talk to an Expert.

Your once-a-season walk-around

Tick what checks out. Anything you can’t tick is worth a closer look.

Things people get told (that aren’t quite true)

“Big-box vanities and quotes mean big savings”

The materials are maybe 40% of a bathroom. Saving 15% on a vanity while the waterproofing gets skipped is a terrible trade. Spend where the water is.

“Grout sealing makes showers waterproof”

Grout and tile are decorative armour. The waterproofing is the membrane behind them. Sealed grout on an unmembraned wall still lets vapour through to the drywall.

“A bathroom reno always needs permits”

Like-for-like swaps usually don't. Moving plumbing, adding a bathroom, or touching structure does. Your contractor should tell you which side you're on before demo, in writing.

What our clients say

Refresh or full reno?

1. The layout…
2. What's the state of the wet zone?
3. Age of the room?

The season calendar

SpringBook now; summer slots go fast
SummerHigh demand; order materials early
FallGreat time to start before holidays
WinterCrews are available; indoor work all season

LF Builders is ready to bring your project to life. Book right now and enjoy a 14% discount, plus get a FREE, no-obligation estimate. Don't wait—click 'Get My Discount' to get started today!